Incoming supply and substation interfaces
Coordinate the utility or plant point of connection, incoming feeder route, metering and protection interfaces, and transformer connections against approved drawings.

Coordinate the utility or plant point of connection, incoming feeder route, metering and protection interfaces, and transformer connections against approved drawings.
Installation interfaces for RMUs and VCB panels, HT cable routing and support, termination and jointing interfaces, cable identification and earthing.
Plan work boundaries, access, outages and tie-in responsibilities with the facility team. Coordinate pre-energisation checks within the agreed scope.
Main and sub-distribution panels, power and motor feeders, busduct interfaces, cable trays, ladders and conduits.
Cable pulling, dressing, glanding, termination and identification for motors, machinery and auxiliary supplies. Coordinate equipment earthing and bonding.
Review connected loads, existing panel capacity, routing and shutdown constraints before adding equipment or altering distribution.
Power and control connections for production machinery, pumps, fans, compressors and packaged equipment.
Motor feeders, local isolators, starters and variable frequency drives, with field wiring and coordination of operating signals.
Confirm equipment locations, terminal schedules, cable entry, earthing points and package supplier responsibilities.

Enclosure and component layout, breaker and contactor mounting, busbar and terminal interfaces, internal wiring, ferrules and circuit labels to approved drawings.
Position and secure panels, coordinate cable entries, terminate incoming and outgoing circuits, bond enclosures and check connections against drawings.
Review single-line diagrams, general arrangements, wiring schematics, equipment schedules and terminal plans for the specified panel package.
Confirm the panel type, ratings, drawings and scope of assembly or installation for your project.
Incoming and outgoing HT feeders, RMU and VCB panel installation interfaces.
Power control centres, main switchboards, incomers, bus couplers and feeder sections.
Motor control centres, feeder starters and local motor control panels.
Automatic power factor correction panels and capacitor bank control interfaces.
Generator changeover, mains failure and synchronisation interfaces as specified.
Machine and process controls, variable frequency drive panels, remote I/O and instrumentation interfaces.
Sub-distribution boards, lighting and utility panels, feeder pillars and local junction boxes.

Coordinate PLC and remote I/O, HMI or SCADA interfaces, motor drives, communications and control panel integration.
Review instrument and I/O lists for sensors, transmitters, actuators, limit switches and feedback signals. Coordinate field wiring and termination.
Define interfaces to existing systems, alarm and interlock requirements, and the agreed scope for program changes, loop checks and functional verification.
Review installation, identification and termination records. Agree continuity, insulation resistance, earthing and other specified tests before energisation.
Coordinate protection and interlock checks, point-to-point and loop checks, motor rotation and sequence trials as applicable to the package.
Agree test responsibilities and acceptance criteria, record results, close punch-list items and submit the specified drawings and handover documents.
Share your single-line diagrams, panel schedules, equipment list and target dates.